Projek Pembinaan Landasan Berkembar Elektrik Gemas – Johor Bahru

Track Route

Image

Project Summary

Tarikh Projek Bermula

Tarikh Projek Siap (Baru)

Pemilik Projek

Kontraktor

Panjang Laluan

Tempoh Perjalanan

: 01 December 2016

: 31 Oktober 2022

: Kementerian Pengangkutan Malaysia

: CRCC CREC CCCC Consortium Sdn Bhd

: 195 Km

: 120 Min (Gemas-Johor Bharu)

Project Introduction

Gemas-Johor Bahru Electrified Double Track Project implementation is a continuation of the existing electrified double track in Malaysia. The 195-kilometer line will complete the double track electrified network from the north (Perlis) to the Southern Peninsula of Malaysia (Johor Bahru) to meet the infrastructure development needs of the rail transport sector.

  • Modified on: 04 Nov 2020
  • Print
  • 4994
logo

Agensi Pengangkutan Awam Darat (APAD),
Aras G, M, 19 dan 20 Menara Tun Ismail Mohamed Ali,
No. 25 Jalan Raja Laut,
50350 Kuala Lumpur

+ Telefon Umum : Klik Sini

Best viewed using 1980 x 1080 resolution, Mozilla Firefox browser, Chrome & Safari

Today 500

Yesterday 1706

Week 5552

Month 500

Number of Visitors: 1403905

  • Last Updated :21 April 2025.