Projek LRT3: Bandar Utama – Johan Setia

MRT Line 3

Image

Project Summary

Tarikh Projek Bermula

Tarikh projek dijangka siap

Pemilik Projek

Kontraktor

Panjang Laluan

Bawah Tanah

Jumlah Stesen

: 07 November 2015

: 28 Februari 2024

: Prasarana

: MRCB-GK

: 37.8 km

: 2 km

: 20

Tarikh Pembukaan :

28 Februari 2024 (Pembukaan Penuh)

Tempoh Perjalanan : 58 min (Bandar Utama-Johan Setia)

Project Introduction

The LRT3 Bandar Utama-Johan Setia project strives to bring accessibility to about two millions residents in the Western Corridor of the Klang Valley by February 2024. With an alignment of 37 kilometers (including 2 kilometers underground), there will be twenty five 25 elevated passenger stations(inclusive of five provisional stations) with some of the stations to be served as “Paid to Paid” Integrated Stations connecting with existing rail/transit lines.

LRT3 will also serve as a backbone system to minimize and alleviate traffic congestion along the highways/roads towards the western corridor of Klang Valley. It will provide good accessibility to ridership, primarily for job catchment areas, commercial, residential, centre of education and recreational.

  • Modified on: 03 Nov 2020
  • Print
  • 401
logo

Agensi Pengangkutan Awam Darat (APAD),
Aras G, M, 19 dan 20 Menara Tun Ismail Mohamed Ali,
No. 25 Jalan Raja Laut,
50350 Kuala Lumpur

+ Telefon Utama : 03-2602 5060

+ Telefon Umum : 03-2603 6600

Best viewed using 1980 x 1080 resolution, Mozilla Firefox browser, Chrome & Safari

Today 16

Yesterday 2105

Week 6443

Month 44002

Number of Visitors: 2755406

  • Last Updated :08 April 2026.